SECTION .0900 - CONTRACT OPERATION OF WATER POLLUTION CONTROL SYSTEMS

 

15A NCAC 08G .0901      RESPONSIBILITIES OF CONTRACT OPERATORS AND CONTRACT OPERATIONS FIRMS

Each contract operator, or contract operations firm, that enters into a contract with the owner of a water pollution control system to operate the system must notify the owner, in writing, within five calendar days of:

(1)           any change in the designation of the Operator in Responsible Charge (ORC) or the Back-up Operator in Responsible Charge (Back-up ORC) of the system; or

(2)           becoming aware of any situation or problem (preexisting, anticipated, or otherwise) which may interfere with the proper operation of the system and necessitate corrective action by the owner.  This notice shall include the comments and recommendations of the operator in regards to actions or measures that should be taken to correct the noted situation or problem.

 

History Note:        Authority G.S. 90A-44; 90A-45;

Eff. April 1, 1999;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. July 26, 2015.